| Project: | | |
| Location: | Chukchi Sea, AK | |
| Latitude: |
71° 13'N | |
| Longitude: |
164° 15'W | |
| Seafloor: | 42 m | |
| Currents: | 35 cm/s | |
| Deployment: | 12 months | |
| |
| Instruments: | | |
| ASL Ice Instr. | 1 | |
| RCM-9 (ox,turb,cond) | 1 | |
| release | 1 | |
| Mooring: |
| Instrument: | Depth: | |
| ASL Ice Instr. | 36m | 36" Syntactic float/frame |
| RCM-9/ox/turb/cond | 39m | |
| release | | |
| seafloor | 43m | |
| |
| Previous Deployments: |
13CKIP-2A, Aug. 2013 |
| |
| Mooring Design Change: | none |
|  |
original
 |