Depth Operation Mooring Micro RCM   rel.
      Cat 9 PC02  
    Subsurface Moorings        
194 m Deploy 13CB-1A 1 1   1
             
    TOTAL 1 1   1
             


  1 Cruise Information:  Deployment during Dyson transit Kodiak-to-Seward, March 28-April 3
  2 Loading 13CB-1A: Mooring equipment will be shipped to Kodiak via Horizon. Load March 11-12, leaves March 13.
  3 NOTE: This subsurface mooring to be deployed along with Surface PC02 mooring belonging to another project.