EcoFOCI Mooring Hardware Request

Contract Vessel (Bering & Chukchi Seas) - tbd
June 2013

 
link back to main EcoFOCI Mooring Page for 2013
Yellow mooring float with ice profiler in frame. Photo by Scott McKeever
Click for larger image


Updated: June 25, 2013
      75 300 600   ASL             RCM   temp. temp. AURAL AWCP PALS IPS5  
Approx. Operation Mooring kHz kHz kHz TAPS Ice Eco ISUS ISUS SUNA PCO2 Micro 9  ox/ Sea sensor sensor Sound Rec Sound Rec Sound Rec Ice rel.
Depth     ADCP ADCP ADCP   Buoy Fluor. (pmel) (UAF) (pmel)   Cat turb/cond Cat SBE-39 MTR (MML) (PSU) (UW) Profiler  
    Subsurface Moorings                                        
72 Rec/Deploy 13BS-2C           1   2   1 2 1 2 3 10         1
72 Rec/Deploy 13BSP-2B   1                           1 1 1   1
72 Rec/Deploy 13BS-4B           1         3   1 5 10         1
72 Rec/Deploy 13BSP-4B   1                           1       1
70 Rec/Deploy 13BS-5A           1         2   1 9           1
70 Rec/Deploy 13BSP-5A1   1                           1 1 1   1
72 Deploy 13BSIP-5A                                     1 1
71 Rec/Deploy 13BS-8A           1         2   1 8           1
71 Redc/Deploy 13BSP-8A1   1                           1 1     1
43 Deploy 13CKP-1A   1       1 1           1             1
42 Rec/Deploy 13CKP-2A     1     1 1           1             1
43 Deploy 13CKP-5A   1       1 1           1             1
43 Deploy 13CKP-6A     1     1 1           1             1
43 Deploy 13CKP-7A     1     1     1       1             1
43 Deploy 13CKP-8A   1       1             1             1
1000 Deploy 13CKP-9A 1 <--  moved to Healy cruise. see below (2).       1 3               1
43 Deploy 13CKIP-1A         1             1               1
42 Rec/Deploy 13CKIP-2A         1             1               1
43 Deploy 13CKIP-5A         1             1               1
43 Deploy 13CKIP-6A         1             1               1
43 Deploy 13CKIP-7A         1             1               1
43 Deploy 13CKT-1A       1             1                 1
42 Rec/Deploy 13CKT-2A       1             1                 1
43 Deploy 13CKT-5A       1             1                 1
43 Deploy 13CKT-6A       1             1                 1
43 Deploy 13CKT-7A       1             1                 1
43 Deploy 13CKT-8A       1             1 1               1
    TOTAL 0 7 3 6 5 10 4 2 1 1 15 7 11 25 20 4 3 2 1 26
                                             


1 Cruise Information: Contract Vessel (tbd)
2 Shipping Information: load in Seattle mid-June  (subject to change)
3 Special Request: Include additional lengths of spare chain pieces: 3 @ 5m and 6 @ 1m
NOTE 1
13BSP-5A and 13BSP-8A were built on a previous order, and are stored waiting a cruise.. These have been moved from April cruise list to this June cruise.
NOTE 2
13CKP-9A was built with this order, but will be loaded on CGC Healy in early July for Fall deployment.