EcoFOCI Mooring Hardware RequestOscar Dyson DY13-05 |
Updated: February 28, 2013 |
300 | 75 | ISUS | AURAL | AWCP | PAL | Temp | Temp | ||||||||||
Approx | Operation | Moorings | kHz | kHz | ECO | nitrate | Micro | RCM-9 | SeaCat | Sound Rec | Sound Rec | Sound Rec | Sensor | Sensor | PC02 | Weather | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Depth | ADCP | ADCP | fluor | (UAF). | Cat | (MML) | (PSU) | (UW) | MTR | SBE-39 | Pak | Rel. | |||||
Surface |
Mooring |
||||||||||||||||
72 | Rec/Deploy | 13BSM-2A | 2 | 2 | 3 | 1 | 3 | 5 | 8 | 1 | 1 | ||||||
Subsurface |
Mooring |
||||||||||||||||
157 m | Deploy | 13GPP-32A | 1 | 1 | 1 | ||||||||||||
144 m | Deploy | 13GPP-34A | 1 | 1 | 1 | ||||||||||||
183 m | Deploy | 13GPP-36A | 1 | 1 | 1 | ||||||||||||
191 m | Deploy | 13KEP-41A | 1 | 1 | 1 | ||||||||||||
120 m | Deploy | 13SVP-39A | 1 | 1 | 1 | ||||||||||||
72 | Rec/Deploy | 13BSP-2A | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||
72 | Rec/Deploy | 13BS-4A | 2 | 2 | 2 | 1 | 1 | 6 | 9 | 1 | |||||||
72 | Rec/Deploy | 13BSP-4A | 1 | 1 | 1 | 1 | |||||||||||
70 | Deploy | 13BSP-5A2 | 1 | 1 | 1 | 1 | 1 | ||||||||||
71 | Deploy | 13BSP-8A2 | 1 | 1 | 1 | 1 | |||||||||||
102 | Rec/Deploy | 13PA-1A | 1 | 2 | 1 | ||||||||||||
TOTAL | 5 | 4 | 4 | 4 | 11 | 3 | 4 | 4 | 3 | 2 | 13 | 17 | 1 | 1 | 12 | ||
Loading Information | TBD | |
Shipping Information | April, 2013 shipment: 10 moorings above are to be shipped with the Kodiak moorings.
Bering Sea Moorings: 13BSM-2A, 13BSP-2A, 13BS-4A, 13BSP-4A and 13PA-1A; and GOA moorings from EDD-Footprints Request# 257 11/8/2012. 13GPP-32A, 13GPP-34A, 13GPP-36A, 13KEP-41A and 13SVP-39A. |
|
NOTE 1 | These 5 moorings requested on 11/8/2012 (#257, originally GOA-W), and, moved to this April/May GOA & BS cruise | |
NOTE 2 | 13BSP-5A and 13BSP-8A have been moved to June 2013 Chukchi/Bering Seas cruise. These moorings were built with the April 2013 cruise list, and stored at PMEL awating future cruise. |