September 2004 - Ewing 04-09

04SSP-3B Subsurface Mooring September 2004

Project: FOCI  
Project #:  
Location: Shelikof Straits  
Latitude:    
Longitude:    
Seafloor: 198 meters  
Currents: 100 cm/s  
Deployment: 6 months  
     
Instruments:    
ADCP 1  
RCM-9 1  
Microcat 1  
Release 1  
Mooring:    
Instrument: Depth:  
75 kHz ADCP 188m  
Microcat 192m  
Release    
seafloor 198m  
     
Previous Deployments:    
  04SSP-3A, April 2004  
     
Mooring Design Change:    
1 change 300kHz ADCP to 75 kHz. and move to 188m. remove RCM9.