Project: | GLOBEC |
Project #: | 8K3C1495 |
Location: | Seward Line |
Latitude: |   |
Longitude: |   |
Seafloor: | 187 meters |
Currents: | 100 cm/s |
Instruments: | |
Weatherpak | 1 |
SeaCat(FL/NP)/WS | 1 |
RCM-9 | 1 |
MTRs | 4 |
Microcat | 2 |
Nitrate Meter | 1 |
Taps Profiler | 1 |
Benthos Release | 1 |
Mooring: | |
Instrument: | Depth: |
Weatherpak | surface |
Microcat | 1m |
MTR | 8m |
SeaCat(FL/NP)/WS | 15m |
Nitrate Meter | 16m |
RCM-9 | 18m |
TAPS Meter | 20m |
Micro Cat | 27m |
MTR | 33m |
MTR | 39m |
MTR | 45m |
Benthos release |   |
seafloor | 187m |
Previous Deployments: | |
02GBM-3B Sept.2001 | |
Mooring Design Change: | |
1 | added MTR at 8 meters |
2 | changed depth on RCM-9 from 21 to 18m |
3 | changed depth on TAPS from 25 to 20m |