Table for Berchok, 20 NMML moorings

Mooring Hardware Request

NMML - C. Berchok
July 2014
20 Moorings
(Beaufort, Bering, Chukchi Seas)

  link back to main EcoFOCI Mooring Page for 2013
Yellow mooring float with ice profiler in frame. Photo by Scott McKeever
Click for larger image
updated 8 April 2014

Subsurface Moorings July 2014

20 subsurface moorings will be deployed (see image below, right)
Releases and Stainless from 9 moorings will be turned around at sea.
Equipment will load the week of July 14, 2014 (estimate).
=>HOLD THIS WORK until budget is approved (C.Berchok)!

No floats are required from the shop.
No deck set (sharing with Floering).
No ship loading assistance needed.
No new swivels/isolator plates (use parts from last year's at-sea work).

Need:
Project: NMML - C.Berchok 
Location: Beaufort, Bering, Chukchi Seas 
Latitude:  
Longitude:  
seafloor ~40 meters 
Deployment12 months 
 
Instruments:
AURAL 20NMML
release 20 
Mooring:
Instrument:Depth 
30" float 1m stainless chain float-to-AURAL
AURAL   1m chain AURAL-to-release
release  1.5m chain release-to-anchor
seafloor   varying depths (40,50,100m)
 
Shipping Information: Estimate loading Sand Point, week of July 14, 2014
 
Special Note: Some turnaround from last year.  See "Need" above for needed parts.
 